May 18, 2014

Paint and Granite

There's been a major transformation in the past week that has made a construction site really begin to look like a home. What's made the difference?
WE HAVE PAINT!

Most of the house has been painted with a color called "Candlelit Beige", but what's in a name?
But the media room and the art studio have been done in a neutral shade of gray, the name of which escapes me right now, but like I said, what's in a name? And all the woodwork in the railings and staircase have received their ebony stain, which compliments the wrought iron really well, don't you think?
AND WE HAVE COUNTERTOPS!...

... in the kitchen ...
... in the bathrooms ...
... and even in the pantry, where the cabinets have been reinstalled after the shelves were extended, the box for switches was lowered and the painting was done.
And here's a couple pics from opposite ends of the studio. Believe it or not, all the walls and ceiling are the same shade of gray. Isn't it surprising how the light makes it all look so different?

I'll have to think of a way to block the light from coming in through the double doors on the east wall. Then all the natural light in the studio will be coming from the north windows.
("HUH?" I hear you ask. Don't worry. It's an "artist thing".)

May 08, 2014

Alright already! Here's the latest news!

I've been told that some of our subscribers have been asking why there haven't been more updates. So I thought I'd better get my act together and post new pictures. This one's for you Eddie O!

Since our last post the problems we'd mentioned have been taken care of and things have been moving ahead, but there have been some more ... well, ... we suppose you'd have to call them "errors", but one by one they're being addressed.

Most of the cabinets have been delivered and installed throughout the house, but there will have to be some "adjustments" done. In the kitchen there are some flaws showing up in the construction and the materials. In the pantry one of the cabinets is partially covering an electrical box. The cabinets for the utility room were finished in the wrong color.
In the master bath one medicine cabinet never showed up. The medicine cabinets for the second floor baths, which are the same color as the master bath cabinets, are too short for the openings in the wall. (Or the openings for them are too tall, take your pick.)
The rustic maple selected for the studio bath is a bit more "rustic" than we'd anticipated.
The interior doors, wood trim, shelving and closet rods were delivered. The interior doors were installed, but for some strange reason, someone decided it would be a good idea to install the door on the toilet room in the master bath to open inward ... toward the toilet. So that will have to be changed.
The shelves for the pantry were put in but will need some further attention because parts of them are missing and others block an electrical outlet and extend into a place where an appliance needs to be.
On the up side, the second floor and stairway railings are in and they look great. Here are views of them from the first floor.
And here's what they look like from above. The woodwork parts of them are patiently waiting for ebony stain.
The crown molding was put in the ceiling trays in the dining room and master bedroom. It was done exactly the way we wanted it. I guess the diagram (with instructions in Spanish) that I created , printed off and taped on the wall paid off.
Some more work has been done on the septic field too.





The project supervisor told me that stone was delivered for the fireplace and that he would be scheduling interior painting soon. That still leaves flooring (tile, hardwood and carpet), and the electrical (switches, outlets and lighting fixtures inside and out) and all the plumbing fixtures, including the tub in the master bath. Seems to me like there's still much to get done, but we've been told twice now, more than a week apart to expect a late June or early July completion.
So the question is "what will we be doing on the 4th of July? MOVING???"
We'll see.

April 20, 2014

Pardon progress problems people, please practice patience.

Well the week before last was a bit of a disappointment.

On the upside, work on the septic system is well underway. The hole was dug for the holding tank ...
... and it was delivered and put in place and then enough water was added to keep it in place on the off chance that we should get some much needed rain.

And cedars were cleared to make a place for the drain field down on the lower level of the property. Some more will be removed to clear a path for a truck to deliver materials to the site. They'll all be piled together where they can dry out while we wait for enough wet weather to end the burn ban and then it's "Goodbye Cedars"!  There will still be plenty left to provide cover for wildlife.


The stucco work has been completed and painted.



All our cabinetry has been manufactured, and would have been delivered for installation last Monday, but the drywall was holding up progress. The drywall material was delivered Wednesday of that week, however by midday Friday nothing had been done with it.

But by some seeming bit of magic, all the drywall was hung by Monday.
Our problem is that taping and floating of all the joints didn't get started.  Why not?  Well .... it seems there was a shortage of drywall workers!  Can you believe that?!?!?!?!?
Which of course delayed putting on the texture.
Which in turn pushed back the delivery of all the cabinets.
And delays painting the interior.
And we'd discovered that the painters had painted the window frames on the front of the house with the trim color, but hadn't painted the windows on the back.

The week just past wasn't much better in terms of progress.   The trenches for the pans for the septic field were being dug and the pans were onsite, so that was good. And the taping and floating drywall joints was done, and we would have been ready for the texturing to be put on Saturday, but on Friday I discovered that in the dining room and master bedroom around the tray ceilings there was supposed to have been a 90 degree edge and instead I found they'd used a bullnose.  Same was true in the studio with the overhead beam.  So those places will have to be redone, which of course again pushes back texturing, cabinets and painting.
All in all, in the past two weeks, while we're still moving forward, progress hasn't exactly been stellar.

We know, we know, .... patience.

April 06, 2014

And the beat goes on .... and on ....and on

A lot has been happening since our last post.

 

The low voltage infrastructure has been installed, which includes conduits for hookups for television in two different places in the media room,

 

 

  the security system (with intruder detection for all windows and doors along with internal motion sensors), all the wiring for speakers throughout the house and studio and data lines for internet hookups.

In the master bath, the pocket door frame has been installed, the waterproof membrane has been installed in the master shower and tested for holding water (it passed inspection, as did the upstairs and studio bathtubs) and the windows were installed above the master bathtub.

 

 

The AC unit that had been installed in the second floor attic was determined to be inadequate for the task so it was replaced ....

 

 

 

 .... and the rubber membrane was installed on the second floor balcony (so rainwater can't leak onto the front porch below it).

 

 

The Hardieplank across the back of the house and studio and through the breezeway has been painted.

 

 

The insulation has all been installed ....

(Shown here are the upper south ...

... and west walls of the Great Room.)

We even added insulation to the garage walls ourselves, (so it can be advertised as having an insulated garage), but having it there will make things much more comfortable in there for the art classes.

And the stucco crew has been hard at work, with first the wire mesh being nailed on and coverings put everywhere you would not want to see stucco, ....

 

 

....followed by the first of three coats of stucco ...

 

 

... including the walls around the second floor balcony.
Two more coats of stucco and then it all gets painted to match the Hardieplank.

 

 

The drywall, (or wallboard, depending on where you live) has been delivered and is ready to hang. Yet to come is taping and compounding all the joints, finishing with the Monterrey drag texture, and then a little paint (a little? HA!)

Cabinets, counter tops, plumbing fixtures and the list goes on. And so do we.

March 09, 2014

Shingles and Surprises

Well it's been a quiet week at Painted Views, but we're still making progress.

It took two days, but all the shingles are on the roof.  The color is called "Shakewood".  We couldn't get the terra cotta look that we'd
originally wanted so we decided to go with something in the lighter color range to reflect the sun's rays.



Front of house faces west



Three garage bays




Back of house faces east






The fireplace and flue went in this week.





And the big surprise of the week was finding out that a whole house Pest Management System was being installed.  Little hoses were installed in all the exterior walls that will allow a pesticide to be injected and dispersed into the walls to keep out unwanted pests, like spiders, scorpions and the like.  Unfortunately it won't keep out other pests, like bill collectors.

And a deficiency in the AC ducting was discovered  that will require one more chase to be installed on the second floor to allow a return air duct from one of the first floor rooms.  Things like that will come up from time to time but at least this isn't a major problem.

March 02, 2014

Step by step, Moving forward

It's been exactly one month since our last post and we're happy to report that the construction of the house has been moving right along.
The second floor was framed ...
...followed by the roof ...
... including the chimney.
Here are a couple of shots of the kitchen bar, one from the first floor level and the other from up on the second floor east gallery.
The whole house was wrapped in Tyvek ...
... and then the Hardieboard work started, beginning with the soffits going into the eaves first, .....
... and then the Hardieplanks,
going first onto the chimney ....
... and then the walls.
After the sheathing on the roof was completed, then most of the windows and exterior doors were installed.
Hooray! We're almost weather tight!
Looking pretty impressive, huh?
On Friday the 21st, the felt went onto the roof, just in time before a rainy weekend! And all put on by one worker, all by his onesy. What a lonely job.
Some oopsies were discovered in the framing and they got corrected along the way to balance the sizes of the clothes closets in the master bedroom suite and to narrow the top of the fireplace.
And you can see here that during the past week much of the mechanical work was done like the duct work for HVAC and also the plumbing.
And then the electricians had a go at it and there were wires EVERYWHERE!

And the front door was installed (YIPPEEEEE!) but it was all wrapped in plastic so there wasn't much point in posting a picture of it here now. So you'll just have to be patient.


So as you can see there's been a lot of progress, but there's still a long way to go.
Patience .... we must practice patience. But that's no fun at all, is it?

February 02, 2014

We're Being Framed!

We're being framed ....


.... but not in a legal sense, but rather in the form of lumber that goes into place and and really is starting to look like a house. The carpenters began work on Tuesday and by Friday it was surprising to see how much was accomplished.

Most of the first floor was finished by Thursday.....

.... and Friday they began work on the second floor,

which is beginning to give it an impressive look from down at the road.